CBIP to construct RM50.3m palm oil mill in Indonesia
Page 1 of 1
CBIP to construct RM50.3m palm oil mill in Indonesia
CBIP to construct RM50.3m palm oil mill in Indonesia
Business & Markets 2013
Written by Jeffrey Tan of theedgemalaysia.com
Wednesday, 11 September 2013 19:19
KUALA LUMPUR (Sept 11): CB INDUSTRIAL PRODUCT HOLDING [] Bhd (CBIP) announced that it will construct a 60 tonnes per hour Continuous Sterilisation palm oil mill and deliver 3 units of Double Deck Continuous Sterilisation System in Indonesia.
In a statement to Bursa Malaysia, CBIP said its wholly owned subsidiary; Modipalm Engineering Sdn Bhd had accepted the Letters of Award of Contract (LOA) from PT Rafi Kamajaya Abadi, a subsidiary of TDM Berhad, for the palm oil mill project.
The LOA set out to construct the palm oil mill project worth RM50.3 million in Nanga Pinoh Melawi, Kalimantan Barat, Indonesia, it said.
“The LOA is expected to contribute positively to our earnings for the financial years ending Dec 31, 2013, 2014 and 2015,” said CBIP.
Business & Markets 2013
Written by Jeffrey Tan of theedgemalaysia.com
Wednesday, 11 September 2013 19:19
KUALA LUMPUR (Sept 11): CB INDUSTRIAL PRODUCT HOLDING [] Bhd (CBIP) announced that it will construct a 60 tonnes per hour Continuous Sterilisation palm oil mill and deliver 3 units of Double Deck Continuous Sterilisation System in Indonesia.
In a statement to Bursa Malaysia, CBIP said its wholly owned subsidiary; Modipalm Engineering Sdn Bhd had accepted the Letters of Award of Contract (LOA) from PT Rafi Kamajaya Abadi, a subsidiary of TDM Berhad, for the palm oil mill project.
The LOA set out to construct the palm oil mill project worth RM50.3 million in Nanga Pinoh Melawi, Kalimantan Barat, Indonesia, it said.
“The LOA is expected to contribute positively to our earnings for the financial years ending Dec 31, 2013, 2014 and 2015,” said CBIP.
Cals- Administrator
- Posts : 25277 Credits : 57721 Reputation : 1766
Join date : 2011-09-08
Location : global
Comments : “My plan of trading was sound enough and won oftener that it lost. If I had stuck to it Iâ€d have been right perhaps as often as seven out of ten times.â€
Stock Exposure : Technical Analysis / Fundamental Analysis / Mental Analysis
Similar topics
» Hot Stock CBIP rises 3.3% on RM46m PNG palm oil mill job
» Kenanga raises CBIP target price to RM4.90 on winning RM18.8m palm oil mill job
» Fitters Group's green mill makes inroads into Indonesia (9318)
» CBIP wins RM33m contract in Indonesia
» CB Industrial arm bags palm oil mill job (7076)
» Kenanga raises CBIP target price to RM4.90 on winning RM18.8m palm oil mill job
» Fitters Group's green mill makes inroads into Indonesia (9318)
» CBIP wins RM33m contract in Indonesia
» CB Industrial arm bags palm oil mill job (7076)
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|