Bursa Community
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Puncak Niaga water treatment plant shutdown on dangerous ammonia level

Go down

Puncak Niaga water treatment plant shutdown on dangerous ammonia level Empty Puncak Niaga water treatment plant shutdown on dangerous ammonia level

Post by Cals Tue 15 Apr 2014, 11:45

Puncak Niaga water treatment plant shutdown on dangerous ammonia level
Business & Markets 2014
Written by Bernama   
Tuesday, 15 April 2014 07:21

KUALA LUMPUR (Apr 14): The Cheras Batu 11 Water Treatment Plant (LRA) which resumed operation on March 30 was shut down at 3 pm after the ammonia in the raw water rose to dangerous level.

Syarikat Bekalan Air Selangor Sdn Bhd (Syabas) said the ammonia level was recorded at 4.50 part per million (ppm), exceeding the standard set by the
Ministry of Health.

Its assistant general manager of Corporate Communications and Public Affairs, Priscilla Alfred said Puncak Niaga (M) Sdn Bhd, operator of the water
treatment plant, has been informed about the matter.

"With the temporary closure of LRA Cheras Batu 11, areas which receive water supply from the treatment plant face rationing as usual," she said in a
statement today.

Users have been urged to keep enough supply of water during rationing. Syabas will continue to inform users on the status of LRA Cheras Batu 11 depending on the condition of raw water.
Cals
Cals
Administrator
Administrator

Posts : 25277 Credits : 57721 Reputation : 1766
Male Join date : 2011-09-08
Location : global
Comments : “My plan of trading was sound enough and won oftener that it lost. If I had stuck to it I’️d have been right perhaps as often as seven out of ten times.”
Stock Exposure : Technical Analysis / Fundamental Analysis / Mental Analysis

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum