Kencana gets RM208m job for Kebabangan northern hub devt project
Page 1 of 1
Kencana gets RM208m job for Kebabangan northern hub devt project
KUALA LUMPUR: KENCANA PETROLEUM BHD []
has secured a RM208 million contract for the fabrication of a
substructure for the Kebabangan northern hub development project off the
coast of Sabah.
It said on Tuesday, April 26 its unit Kencana HL Sdn Bhd was awarded
the project by Kebabangan Petroleum Operating Company (KPOC).
Under the contract, it would build and commission the substructure for the Kebabangan northern hub.
Kencana said it was a one-off contract and was expected to be delivered to KPOC within the third quarter of 2012.
On Monday, SIME DARBY BHD []
said ts unit Sime Darby Engineering Sdn Bhd was awarded a RM1.15
billion contract to fabricate KBB Topsides for the Kebabangan Northern
Hub Development Project by KPOC.
has secured a RM208 million contract for the fabrication of a
substructure for the Kebabangan northern hub development project off the
coast of Sabah.
It said on Tuesday, April 26 its unit Kencana HL Sdn Bhd was awarded
the project by Kebabangan Petroleum Operating Company (KPOC).
Under the contract, it would build and commission the substructure for the Kebabangan northern hub.
Kencana said it was a one-off contract and was expected to be delivered to KPOC within the third quarter of 2012.
On Monday, SIME DARBY BHD []
said ts unit Sime Darby Engineering Sdn Bhd was awarded a RM1.15
billion contract to fabricate KBB Topsides for the Kebabangan Northern
Hub Development Project by KPOC.
Warrants | KENCANA-CC | KENCANA-CD |
Warrants Reference Price | 0.535 | 0.400 |
Warrants Last Done | 0.530 | 0.390 |
Volume | 1,916 | 700 |
Share Reference Price | 2.670 | 2.670 |
Share Price | 2.680 | 2.680 |
Exercise Price | 1.600 | 1.500 |
Exercise Ratio (warrants per share) | 2 | 3 |
Interest Rate(%) | 2.9930 | 2.9930 |
Dividend Yield(%) | 0.1866 | 0.1866 |
Expiration Date | 18-May-2011 | 14-Sep-2011 |
Days to Expiry | 22 | 141 |
Implied Volatility(%) | 0.0490 | 0.1157 |
Gearing (X) | 2.5283 | 2.2906 |
Effective Gearing (X) | ? | ? |
Premium(%) | -0.7463 | -0.3731 |
hlk- Moderator
- Posts : 19013 Credits : 45112 Reputation : 1120
Join date : 2009-11-14
Location : Malaysia
Re: Kencana gets RM208m job for Kebabangan northern hub devt project
Warrants | KENCANA-CE | KENCANA-CF |
Warrants Reference Price | 0.430 | 0.095 |
Warrants Last Done | 0.415 | 0.090 |
Volume | 1,041 | 635 |
Share Reference Price | 2.670 | 2.670 |
Share Price | 2.680 | 2.680 |
Exercise Price | 1.800 | 2.700 |
Exercise Ratio (warrants per share) | 2 | 3 |
Interest Rate(%) | 2.9930 | 2.9930 |
Dividend Yield(%) | 0.1866 | 0.1866 |
Expiration Date | 03-May-2011 | 25-Jul-2011 |
Days to Expiry | 7 | 90 |
Implied Volatility(%) | 0.0126 | 51.2013 |
Gearing (X) | 3.2289 | 9.9259 |
Effective Gearing (X) | ? | 5.1554 |
Premium(%) | -1.8657 | 10.8209 |
hlk- Moderator
- Posts : 19013 Credits : 45112 Reputation : 1120
Join date : 2009-11-14
Location : Malaysia
Similar topics
» Mah Sing: Conditions for joint devt of Jln Tun Razak project not met
» MMHE unit secures Telok Gas devt project from Exxon
» Naim Eng gets RM208m MRT job (5073)
» Coastal Contracts prices placement shares at RM4.30 to raise RM208m
» Troubled Northern Utility up for sale again?
» MMHE unit secures Telok Gas devt project from Exxon
» Naim Eng gets RM208m MRT job (5073)
» Coastal Contracts prices placement shares at RM4.30 to raise RM208m
» Troubled Northern Utility up for sale again?
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum